Pages

March 22, 2021

India - Indigenous Warship INLCU L-58 Commissioned


 IN LCU L-58, the 8th and the last ship under Project LCU Mark IV, delivered by GRSE on 31 December 2020 was commissioned on 18 March at Port Blair in the presence of Lieutenant General Manoj Pande – Commander-in-Chief Andaman & Nicobar Command (CINCAN). The ceremony was attended by Chairman & Managing Director, GRSE Rear Admiral V K Saxena (Retd), and other senior officials of the Indian Navy and GRSE.

The entire design of the 8 Landing Craft Utility (LCU) Mark IV ships has been developed in-house by GRSE as per requirements specified by Indian Navy including a speed of 15 knots. LCU MK-IV is an amphibious ship with its primary role being transportation and deployment of Main Battle Tanks, Armored Vehicles, troops and equipment from ship to shore. The ships are equipped with Bow Ramps to enable loading/unloading of combat equipment and vehicles upon beaching. These are biggest & fastest Landing Craft Utility vessels worldwide in its category.

No comments:

Post a Comment